SAP BLOG Implementing Certificate Check at Goods Receipt

SAP Blog

Kayıtlı Üye
Katılım
22 Ara 2017
Mesajlar
1,925
Tepki puanı
7
Puanları
6

Disclaimer​


This blog will help to implement receipt of certificate at the time of “Goods Receipt”. The process can be implemented to validate receipt of quality certificate or any other mandatory document at the time of GR, so that necessary actions can be taken by quality department.

There are 2 approaches considered in this blog:

  1. Restrict GR creation, if certificate is missing.
  2. Allow GR creation, if certificate is missing.



Pre-requisites​


To achieve this, QM control key with “Cert required” checkbox active is required. SAP Standard control key “0005 – Delivery release, certificate” is used here.

Config Path : Quality Management -> QM in procurement -> Define Control Key

1-11.jpg


Configuration Required​


One of the important configuration required is Certificate type. Certificate type will decide how system should behave in case of receipt or missing of certificate. Setting “Control without certif” is a key parameter which will decide the behavior at the time of GR.

The certificate type “QCGR” used here, is a custom certificate type.

Config Path : Quality Management -> QM in procurement -> Define Keys for Certificate Processing -> Define Certificate Types

2-4.jpg


Below are the options available under “Control without certi.” option. In this document below indicator are used:

C Without lot: Error message, with lot: Status

D Without lot: Error message, with lot: Error message

3-6.jpg




Master Data​


Following are the master data used in the process:

  1. QM View of Material Master (MM01/02/03).
  2. Quality Info Record (QI01/02/03), applicable as per the control key used.



1. QM View of Material Master

In QM view, maintain Procurement Data & Activate inspection type ’01’, as shown in the images below:

4-3.jpg


5-7.jpg




2. Quality Info Record

As per standard control key “0005” settings, quality info record is mandatory.

Make sure under “Insp. Control => 1 Inspection Active Regardless of Supplier Certification” is active as inspection lot to be created in the process & “Release Until have future date” (as per business requirement).

Note: Quality Info Record creation can be excluded, if “Release Required” indicator of the QM Control key is unchecked.

6-2.jpg


7-2.jpg




Processing​


Scenario 1 : Restrict GR creation, if certificate is missing.

For this scenario, “Control without certif => D Without lot: Error message, with lot: Error Message” is applicable in certificate profile.

A. GR Creation

Under tab “Purchase Order Data“, it is mandatory to select value in “Cert. Enclosed?” else system will not allow to create GR.

8-2.jpg


If Selected ‘No’, System will not allow GR creation, as it is selected to display error message in certificate type config.

9-1.jpg


In this case, GR can be created only if ‘Cert. enclosed’ selected ‘Yes’.

10.jpg


11.jpg


GR creation is successful. Also, system will create inspection lot with status “CROK”.



Scenario 2 : Allow GR creation, if certificate missing.

For this scenario “Control without certif => C Without lot: Error message, with lot: Status” will be applicable.

A. GR Creation

At the time of GR creation,, system will ask for confirmation of certificate receipt & based on the input given, system will update the necessary status for inspection lot.

12.jpg




i. Cert. Enclosed = Yes.

In this case, system will allow the GR creation & inspection lot will have status ‘CROK‘ i.e. ‘Certificate receipt confirmed‘ & usage decision can be taken.

a. GR Creation

13.jpg


b. Inspection Lot Processing

14.jpg


15.jpg


ii. Cert. Enclosed = No.

In this case, system will allow the GR creation but the inspection lot will be created with status ‘CTCM‘ i.e. Certificate conformation missing & usage decision can’t be taken till status changed to ‘CROK‘.

a. GR Creation

16.jpg


17.jpg


18.jpg




b. Inspection Lot Processing

19.jpg


20.jpg


21.jpg


So, in this case system will not allow to post the UD, till the ‘CROK’ status is updated to the inspection lot.

c. Confirming Receipt of Certificate

As the inspection lot is in CTCM status, system will not allow to take the UD. To perform the UD, it’s required to tell system that certificate is received. This can be done in 2 ways:

  • From Inspection Lot

Use below path:

Inspection Lot Number => Edit => Confirm Receipt of Certificate =>Save

22-1.jpg


23.jpg


24.jpg


  • From Quality certificates

There are two transactions which can be used for this i.e. QC52 and QC55, but the process to change the status remains the same.

QC52: This transaction is used for single record processing

QC55: This transaction is used for work list processing


Here, transaction QC55 is used.

25.jpg


Based on the input parameter, system will display the record/s.

26.jpg


Now, select the record & click on button “Change Certificate Data“.

27.jpg


28-1.jpg


In field “Cert. status“, there are multiple options available. Select status as “2 Certificate received” to update inspection lot status as CROK & Save.

29-1.jpg


30.jpg


Now, system has updated inspection lot status to CROK & usage decision can be taken for the same.

31.jpg




Conclusion​

  • By implementing this process, quality team can have control over receipt of necessary certificates at the time of GR.
  • In this document only two approaches are explained, but based on the option selected in the field “Control without certif.” of certificate type more scenarios can be mapped as per requirement.



Note: Any suggestions or modifications are always welcome, so that it can be included in the blog.



Happy Learning!!!
1f642.png


Okumaya devam et...
 
Üst