There have been many discussions / queries when mass changes of master data need to be performed. Usually the focus will go to CEWB transaction. This is a tricky / complex transaction, especially for beginners / users. There have been cases where people usually tend to go for LSMW / BDC when mass update of master data requirement comes up.

The purpose of this document is just to point out an easy option, if the update requirement is more of straight forward changes. CA85N transaction tremendously helps users to make the mass routing changes without much of expertise.

1st Screen: Selection criteria

The initial screen provides selection criteria option as below:


pastedimage_0_598304.png


There are further selection options for people who want to modify materials with specific values:

pastedimage_1_598305.png



ie., click on the “more options” bar at the bottom. This will show Task list header. Drill down to find the detailed selection criteria. Choose the one which you require and provide the selection values.



2nd Screen: New Values
This is the tab where you can enter the new values / modified values

pastedimage_2_598306.png



Example: I wanted to change the setup time of some of the materials to 20 mins.

I have done the material selection in 1st screen and enter the value to be updated in the 2nd screen.

In addition, if you want to change say base quantity and Control key for the selected materials, then click on “more options” bar at the bottom and choose the field values.

pastedimage_3_598307.png



3rd Screen: Options

This is an optional screen. You can choose the action parameters and display options in this screen.

I would like to see in Grid format, so I always choose Grid. There are list options as well.

Click on execute

The list of materials will be shown. Choose the items you want to update and click on “Mass Change”

pastedimage_4_598309.png




pastedimage_5_598313.png


If you go back and check the materials, the details will be shown as updated:

pastedimage_6_598314.png



Choose another material from the above list:

pastedimage_19_598302.png


Short note on technical details:

ABAP Report affected: CP_OPR_MASS_CHANGE

Update operation logic: CP_OMC_MC_MASSCHANGE

The data upload is internally using the same details as that of Change Engineering workbench. The T-code simplifies the activities to an extent. In discrete manufacturing industry if you are managing heavy load of master data, this will be a helpful T-code to work with.
 