Table of Contents
Inspection Type 01- Goods Receipt Inspection
Inspection Type 02- Goods Issue Inspection
Inspection Type: 03 – In Process Inspection
Inspection Type: 04- Final Inspection at GR from Production
Inspection Type: 05- Other Goods Receipt Inspection
Inspection Type: 06- Goods Return Inspection
Inspection Type: 07- Audit Inspection.
Inspection Type: 08- Stock Transfer Inspection
Inspection Type: 09- Recurring Inspection
Inspection Type: 10- Inspection for the Delivery to Customer with Order
Inspection Type: 89 – Manual Inspection
Inspection Type-0101-Source Inspection
Summary chart of the Common Inspection Types used in Quality Management is as follows:
Detailed sequence of the steps to be followed are as given below
Inspection Type 01- Goods Receipt Inspection
Inspection Type: 04- Final Inspection at GR from Production
Conclusion :
Hope, this document covers most of the commonly used Inspection Types used in Quality Management, with the detailed sequence of the steps & mandatory prerequisites to be maintained.
Kindly update with your valuable inputs/feedback, for any changes/additions required, to make it the most useful document.
Many Thanks & Regards: Raja Sekhara Reddy Bannuru
Okumaya devam et...
Inspection Type 01- Goods Receipt Inspection
Inspection Type 02- Goods Issue Inspection
Inspection Type: 03 – In Process Inspection
Inspection Type: 04- Final Inspection at GR from Production
Inspection Type: 05- Other Goods Receipt Inspection
Inspection Type: 06- Goods Return Inspection
Inspection Type: 07- Audit Inspection.
Inspection Type: 08- Stock Transfer Inspection
Inspection Type: 09- Recurring Inspection
Inspection Type: 10- Inspection for the Delivery to Customer with Order
Inspection Type: 89 – Manual Inspection
Inspection Type-0101-Source Inspection
Summary chart of the Common Inspection Types used in Quality Management is as follows:
Detailed sequence of the steps to be followed are as given below
Inspection Type 01- Goods Receipt Inspection
- Create the Raw material, with QM view & inspection Type : 01 Active ( T code : MM01)
- Create the Inspection Plan with Usage: 5 & Status: 4 (T Code : QP01)
- Create the Purchase Order (T Code: ME21N) ( Assuming, there is no Release Strategy)
- GR for the Purchase Order & Stock will get updated in Quality Stock (T Code: MIGO)
- Inspection Lot is created automatically, in the background( Check IL the status : REL)
- Do the Results Recording (T Code : QA32)
- Perform UD & Stock posting & save (T Code : QA32)
- Check the Stock update (You can find the stock in UR) (T code : MMBE)
- Create the ROH Material with QM View Active with 02 Inspection( T Code : MM01)
- Create the Inspection Plan with the Usage: 6 & Status :4 (T code : QP01)
- Goods issue to the Production Order (T code : MIGO)
- Make sure that Inspection Lot is there in REL Status
- Do the Results Recording ( T Code: QA32) ( Same Steps as in the above Process)
- Perform UD, for the above Inspection Lot (It’s not Relevant for Stock Posting)
- Create the FERT Material with QM View Active with 03 Inspection ( T Code : MM01)
- In the Routing, make sure, the Inspection Characteristics are maintained
- Create the Production Order & Release ( T code : CO01/CO02)
- System will generate the Inspection Lot, automatically, during the Release of the Order Lot Origin: 03, also make sure, you control Key settings & confirmation settings
- Do the Results Recording & UD (No Stock Postings in this case)
Inspection Type: 04- Final Inspection at GR from Production
- Create the FG Material with QM View Active with 04 Inspection( T Code : MM01)
- Create the Inspection Plan with Usage: 5 & Status: 4 ( T code : QP01)
- Create the Production Order & Release & Do the Goods Issue & Confirm & GR
- Stock updated in Quality Stock & Inspection Lot is created automatically.
- Make sure that Inspection Lot is there in REL Status( * in CRTD Status, can’t proceed)
- Do the Results Recording ( T code : QA32)
- Perform UD & Stock posting & save ( T Code : QA32)
- Check the Stock update (You can find in UR) ( T Code : MMBE)
- Create the Material with QM View Active with 05 Inspection
- Create Inspection Plan with the Usage :5 & Status : 4 ( T code : QP01)
- Do the Goods receipt, with others (Movement Type: 501) Using the T code: MIGO. System will generate the Inspection Lot automatically during the Goods Receipt
- Results Recording & Perform UD & Stock posting ( Follow this step, as explained above)
- Check the Stock in MMBE (You can find in UR) (( Follow this step, as explained above)
- Create the FERT Material with QM View Active with 06 Inspection
- Create the Inspection Plan with the Usage: 7 & Status : 4
- Create Sales Order (VA01, Order Type: OR)
- Create the Outbound Delivery (T Code: VAO2)
- Do the PGI for the Outbound Delivery (from VA02)
- Create the Return Sales Order (T code: VA01 & Order Type: RE)
- Create Return Delivery for the Sales Order T code: VA02
- System will generate inspection Lot, with the Inspection Type: 06
- Based on the Results Recording UD Done, the Stock from the Customer Returns, can be moved to Blocked/Scraped/Unrestricted.. etc)
- Create the Raw Material with QM View Active with 07 Inspection
- Create the Inspection Plan with the Usage: 3 & Status : 4
- Trigger the Inspection Lot Manually: QA01 (Maintain the Vendor Ref.)
- Do the Results recording & UD ( Follow this step, as explained earlier above)
- It’s not the Stock Relevant
- Create the Material Master with QM View Active with 08 Inspection( T code : MM01)
- Create Inspection Plan with the Usage : 5 & Status : 4 ( T code : QP01)
- Create the Stock Transfer Posting using MIGO (Move Type : 311, for Plant to Plant)
- System will generate Inspection Lot with 08 inspection Type automatically
- Results Recording & Perform UD & Transfer Posting( T code : QA32)
- Check the Stock update MMBE
- Create Material with Batch Management Active & Activate the Inspection Set up: 09
- Maintain the Inspection Interval in the Material Master
- Maintain the Inspection Plan with Usage: 9, Status: 4 ( T code : QP01)
- Goods Receipt with Code: MIGO
- Batch Created at the Goods receipt time
- In the Batch Details, System will update the Next Inspection date ( Automatically)
- Next Inspection Date = Goods Receipt Date + Inspection Interval
- SLED DATE = Date of Manufacture + Total Shelf Life
- On Next inspection Date by executing QA07, System will generate the Inspection Lot
- Need to run the Dead Line Monitoring Report, to pull those Batch’s, which are due for the Recurring Inspection
- Create the Material Master with QM View Active with 10 Inspection
- Create the Inspection Plan , with the Usage : 6 & Status : 4
- Create Sales order (T code: VA01)
- Create the Delivery for the above Sales Order (T code : VA02)
- Automatically, Inspection Lot was created during the Delivery Creation
- Results Recording & UD (NO STOCK POSTING) (( Follow this step, as explained earlier
- Do the PGI (Post Goods issue) for the Delivery. System will warn about the Inspection Lot Status, if the corresponding Inspection Lot is not completed/updated
- Create the Material with QM View Active with 89 Inspection
- Create Inspection Plan, with the Usage : 3 & Status: 4(T code : QP01)
- Create Inspection Lot ( T Code : QA01)
- Results Recording & Perform UD ( Follow the steps, as explained above)
- Check the Stock in MMBE (Stock remains the same, No change)
- Create the ROH Material with QM View Active with 0101 Active ( T code : MM01)
- Maintain the QM Procurement Active & assign the Control Key (0007) ( T code : MM02)
- Maintain the QI info Record, with the Source Inspection maintained ( T code : QI01)
- Create the Inspection Plan with Correct Status (501) ( T Code : QP01)
- Create the Purchase Order (T code : ME21N)
- Execute the QI07, with the material, Plant & Vendor Combination ( T code : QI07)
- Select the required Purchase Order, Create Inspection Lot Manually
- Do the Results Recording & UD for the Inspection Lot (No Stock Postings)
Conclusion :
Hope, this document covers most of the commonly used Inspection Types used in Quality Management, with the detailed sequence of the steps & mandatory prerequisites to be maintained.
Kindly update with your valuable inputs/feedback, for any changes/additions required, to make it the most useful document.
Many Thanks & Regards: Raja Sekhara Reddy Bannuru