SAP BLOG S4 HANA migration – Manufacturing Simplification List

SAP Blog

Kayıtlı Üye
Katılım
22 Ara 2017
Mesajlar
1,925
Tepki puanı
7
Puanları
6
The new SAP implementations or migrations are on SAP S4 HANA 1610 and higher versions. When we upgrade or migrate from SAP ECC 6.X to S4 HANA we need to take into consideration some of the perquisites, which SAP has published in the Simplification list. In the simplification list, the features that are available, functionality added and those functionalities that are being stopped are shared. During the migration activities some of the important facts needs to be shared with the client also.

Some of the important features related to manufacturing area are mentioned below.

S4-Conversion-steps.jpg


The sequential steps to migrate is shown in the below picture:

Some of the features and the functionalities in the Manufacturing area are detailed out below:

The length of the material code has been extended from 18 CHAR to 40 CHAR.

Some of the changes in the Material Requirement Planning views namely MRP-1,2,3,4 are

  1. Unit of measure group which is used in the retail (MRP-1)
  2. MRP considers the quota arrangement – Quota arr. usage (MRP-2)
  3. Selection of BOM and routing is based on production version – Selection method (MRP-4)
  4. Action control, Fare share rule, push distribution, deployment horizon are part of REM or assembly manufacturing
  5. Another part is the storage location tab for storage location MRP planning

Henceforth all the above mentioned are not activated. Material requirement has been simplified in the S4 HANA version.

Transactions related to the logistics batch management have been replaced by enjoy transactions – MSC1N, MSC2N, MSC3N, MSC4N.

MRP Live in HANA

MRP live is one of the improved version in material requirement planning. It reads the material receipts & requirements, calculated the shortages and then creates the planned orders and the purchase requisitions. Some of the advantages of MRP live are as follows:

  1. It allows to plan the set of materials specified for the MRP planner and also across different plants.
  2. We can also plan the group of the materials assigned to product group.
  3. MRP live plans the materials sequentially by determining the requirements and across different plants.
  4. It is also a pre-requisite for the future proposed solution like PP/DS in S4 HANA

Some of the differences in the classic MRP and the MRP live are

  1. It does not write the MRP lists
  2. Make to order planning – MD50 is not optimized in HANA
  3. Projects related planning – MD51 is also not optimized in HANA.
  4. Purchase requisitions are created for the materials which are defined for external procurement. Purchase requirement indicator as available in classic is not available in MRP Live
  5. Also delivery schedule lines are created automatically based on the valid delivery schedules. Delivery schedule line indicator is not available in MRP live.

Planning file Entry logic has been simplified and optimized in S4 HANA for consistence and update performance. MRP always determines the shortages and requirements of all the known materials. MRP does not support the NETPL- Net change planning in the planning horizon.

MRP live does not consider the forecast based planning but it markups the requirements and sends the information to be processed in the classic ABAP based planning. This effects the performance. The forecast demand and the planned independent requirements are similar. But, S4 HANA avoids the redundant data functionality. So the forecasted information should be passed to the demand as planned independent requirements and the MRP type should be VV.

ABAP List based PI sheets have to be replaced by browser based PI sheets. Currently there is no other alternative. Currently in the system X-Step based process instructions are available in S4 HANA and are to be used over the characteristic based process instructions.

Another functionality is MRP related to subcontracting. For every subcontracting vendor we need to maintain the subcontracting vendor as one of the MRP area. For every part provided to the subcontractor a new area specific master data is not be created every time.

Sales Operation Planning(SOP) is going to be replaced by Integrated business planning (IBP). IBP supports all the features of SOP like – Forecasting, Multi-level planning, along with some advanced features like – advanced statistical forecasting, multi-level supply planning, an optimizer, collaboration tools, using an Excel-based UI, and Web-based UIs.

There are many more features and functionalities that are going to come with the latest versions of S4 HANA. Many of the interfaces like Manufacturing Execution and Manufacturing Intelligence & Integration, Plant connectivity are going to be the advanced features in the manufacturing area that are going to be seen a big change.

Material length in ECC

ECC-Material.png


Material length in S4 HANA

S4-HANA.png


MRP 1- Unit of Measure Group in ECC

MRP-1-Unit-of-Measure-Group.png




MRP 1- Unit of Measure Group in S4 HANA

MRP-1-Unit-of-Measure-Group-in-S4-HANA.png




MRP 2 – Quota arr. usage in ECC

MRP-2-Quota-Arr.Usage_.png


MRP 2 – Quota arr. usage in S4 HANA

MRP-2-–-Quota-arr.-usage-in-S4-HANA.png


MRP 4 – Selection Method in ECC

MRP-4-–-Selection-Method-in-ECC.png


MRP 4 – Selection Method in S4 HANA

MRP-4-–-Selection-Method-in-S4-HANA.png




MD02 – Single item Multilevel planning in ECC

MD02-–-Single-item-Multilevel-planning-in-ECC.png


MD02 – Single item Multilevel planning in S4 HANA

MD02-–-Single-item-Multilevel-planning-in-S4-HANA.png




MRP Live In S4 HANA

MRP-live-in-S4-HANA.png


The above simplification list would give handy information for those who are in S4 HANA conversion and migration projects in manufacturing area.

Cheers
KK

Okumaya devam et...
 
Üst