In SAP PM, when there is a malfunction of any of the equipment, which requires a response from Maintenance team, the process of correcting this situation is known as Breakdown maintenance. Breakdown maintenance is required in the following situations −

  • Equipment is not working properly.
  • Production is affected when a technical equipment breaks down.
  • You create a M2 malfunction notification and PM02 order type and equipment is repaired at the site. In breakdown maintenance, you use catalogs and codes in notification.
Creating a Notification
Step 1 − To create a notification, navigate to Logistics → Plant Maintenance → Maintenance Processing → Notifications → Create or use T-code − IW21

notification.jpg

Step 2 − Click Create Notification and you will be prompted to select a Notification type.

Step 3 − Click to get the dropdown list and select the field. Select the notification type as M2 − Malfunction report

notification_type.jpg

As the system is to be configured for internal notification, there is no need to enter any other information.

Step 4 − Click the tick mark at the top.

tick_mark.jpg

Step 5 − In the next window, enter the notification description. To get the functional location, go to the functional location field and search from the available list.

malfunction_report.jpg

Step 6 − Next is to select the Equipment. Select the Equipment number by technical Id number and click the tick mark button to populate this.

technical_id_number.jpg

Step 7 − Enter the value for the following fields −

  • Planner group field
  • Main WorkCtr. field
  • Person respons. Field
  • Reported by field
  • Subject Long Text field
Step 8 − Once you enter all the fields, click the green tick mark at the top.

responsibilities.jpg

Step 9 − To save the notification, click the Save button.

saved_notification.jpg

Changing the Notification
To change the notification, go to Logistics → Plant Maintenance → Maintenance Processing → Notifications → Change or use T-code − IW22

change_notification.jpg

Enter the notification number and click the tick mark at the top.

notification_number.jpg

Creating Breakdown Order for Notification
Step 1 − To create a breakdown maintenance order for notification, navigate to Logistics → Plant Maintenance → Maintenance Processing → Order → Create (Special) → Order the notification.

Or use T-code − IW34

order_for_notification.jpg

Step 2 − Enter the notification number.

Step 3 − Select the order type as PM02 Breakdown Maintenance Order.

order_type.jpg

Step 4 − Once you enter the details, click the tick mark at the top.

order_number.jpg

Step 5 − Key in all the positions in Header data.

header_data.jpg

Step 6 − Go to Operations tab and enter all the details. Add other operations as required.

operation_tab.jpg

Step 7 − Click the Component tab to assign components that are required for the operations.

component_overview.jpg

Step 8 − Enter the following details as shown in the screenshot.

component_details.jpg

Step 9 − Select both the component entries and click on the icon shown in the following screenshot to check material availability.

maintenance_order.jpg

Step 10 − To enter procurement of external services, go to Operations tab and click the EXTERNAL button at the bottom.

external_services.jpg

Step 11 − Click the green tick mark to validate the order. To save the order, click the Save button at the top.
 