INTRODUCTION
In this blog post you will learn about integration SAP PP PS with material component.
One of process integration between PP and PS is when you release a project structure (include Work Breakdown Structure, network, and material component) and it will be triggered to production planned order creation.
For detail process will be explained in Main section.
MAIN
If we want to make integration process between SAP PP and PS, we can follow these steps =
CONCLUSION
We can make integration process between SAP PP and PS with material component.
This process can be used for production based on project.
Thanks and regards
Anita A.
Okumaya devam et...
In this blog post you will learn about integration SAP PP PS with material component.
One of process integration between PP and PS is when you release a project structure (include Work Breakdown Structure, network, and material component) and it will be triggered to production planned order creation.
For detail process will be explained in Main section.
MAIN
If we want to make integration process between SAP PP and PS, we can follow these steps =
- Create project structure include project header, Work Breakdown Structure (WBS), Network, and Material Component (Tcode CJ20N)
- Create WBS Bill of material (Tcode CS71).
- Create Routing (Tcode CA01).In routing header select “material assignment” and input counter routing, material number, plant,and WBS element
- Create cost estimate (Tcode CKW1) and Release cost estimate (Tcode CKW4)
- Release Project ( Tcode CJ20N) and planned order is created automatically.
CONCLUSION
We can make integration process between SAP PP and PS with material component.
This process can be used for production based on project.
Thanks and regards
Anita A.