- Katılım
- 8 Eki 2016
- Mesajlar
- 939
- Çözümler
- 4
- Tepki puanı
- 276
- Puanları
- 63
- Yaş
- 42
- Konum
- İzmir
- Web Sitesi
- sapforo.com
- Kullandığınız SAP Modülleri
-
- SAP MM
- SAP PP
- SAP FI
- SAP QM
- Katılım Bölgesi
-
- İzmir
Transferring a quantity from one storage location to another can be accomplished by either using MIGO transaction or MB1B.
I will demonstrate the transfer posting process using MB1B as you have already seen MIGO in action.
Step 1)
Step 2)
The material document number is assigned.
If you need to cancel this posting, you can use either MBST or MIGO transaction.
I will demonstrate the transfer posting process using MB1B as you have already seen MIGO in action.
Step 1)
- Execute the transaction MB1B.
- Enter movement type (311), source Plant and Storage location. Hit ENTER.
Step 2)
- Enter receiving storage location,
- material number,
- quantity,
- unit of measure.
The material document number is assigned.
If you need to cancel this posting, you can use either MBST or MIGO transaction.