Hello everyone,
This is a pretty straightforward document explaining the steps required to do Usage decision without Results Recording in Quality Management.
First we need to setup Material master in which no QM control key will be used.
We will be using Inspection type 01. Check ‘Post to insp stock’ and inspection percentage as 10
When we create a PO stock type is Quality inspection
Stock type is Quality Inspection while doing GR of PO
Stock posted in Quality inspection
Check Inspection lot
Sample size taken with respect to the percentage maintained in material master. Also inspection lot has Release status.
There’s no inspection plan for the inspection lot, so no RR
Now lets do UD without RR
UD completed, also indicated in the system status
After UD stock is now in unrestricted use
If you have any queries please feel free to ask.
Okumaya devam et...
This is a pretty straightforward document explaining the steps required to do Usage decision without Results Recording in Quality Management.
First we need to setup Material master in which no QM control key will be used.
We will be using Inspection type 01. Check ‘Post to insp stock’ and inspection percentage as 10
When we create a PO stock type is Quality inspection
Stock type is Quality Inspection while doing GR of PO
Stock posted in Quality inspection
Check Inspection lot
Sample size taken with respect to the percentage maintained in material master. Also inspection lot has Release status.
There’s no inspection plan for the inspection lot, so no RR
Now lets do UD without RR
UD completed, also indicated in the system status
After UD stock is now in unrestricted use
If you have any queries please feel free to ask.